Project Kickoff Lab

Six steps. One complete implementation lifecycle. Everything you learned in Halls 1 through 8 — applied in sequence to GlobalMerge Corp from blank application to locked and reported Q1 close. This is where the theory becomes a project.

Step 1 — Requirements Step 2 — Metadata Step 3 — Data Load Step 4 — Consolidate Step 5 — Journals Step 6 — Reporting
🗺️ The Six-Step Lifecycle
How all eight halls connect in a real GlobalMerge implementation

Every FCCS implementation follows the same sequence — whether it takes six weeks or six months. This lab compresses that lifecycle into six decision-rich steps, each anchored to the halls you have already walked. The order is not arbitrary: each step creates the foundation the next step depends on.

StepActivityHallGlobalMerge Deliverable
01Requirements — scope, entities, currencies, governance decisionsHall 1Application creation checklist — Multi-Currency, ICP, Equity Pick-up confirmed
02Metadata — dimensions, hierarchies, alternate rollups, ICPHall 2Entity hierarchy loaded, Account dimension configured, SC status resolved
03Data Integration — DI rules, member mappings, Replace modeHall 3All four entities at Impacted — SAP/Oracle/NetSuite trial balances loaded
04Consolidation — translate, proportion, eliminate, equity methodHall 4All entities OK — DeutschWerk NCI verified, BritEdge IC elimination confirmed
05Journal Adjustments — Enterprise Journal, workflow, post, rerunHall 6Unrealised profit elimination posted — entity back to Impacted, rerun → OK
06Reporting — consolidated P&L, board pack Book, burst to controllersHall 7Q1 board pack delivered — entities locked, period closed
What Hall 8× is not

This is not a Hall 5 deep-dive on rules, a Hall 7 deep-dive on reporting, or a Hall 8 deep-dive on security. Those halls cover each domain in full. Hall 8× is the connective tissue — the implementation sequence that shows how every domain decision affects the next.

The Decisions That Cannot Be Undone
Step 1 is the most consequential step — these are locked in at application creation
DecisionGlobalMerge choiceWhy it cannot change
Multi-CurrencyEnabled — GBP, EUR, SGD entitiesCannot be added after creation. Without it, no translation for BritEdge, DeutschWerk, AsiaLink.
Intercompany TrackingEnabled — DeutschWerk sells to BritEdgeCreates ICP dimension. If omitted, Standard Eliminations cannot match IC transactions.
Equity Pick-upEnabled — AsiaLink 50% JV, NovaTech 30%Creates FCCS_EPU data source member. Without it, equity method is manual.
Calendar12-month — Jan–Dec fiscal year13-month cannot be converted to 12-month after data is loaded.